Any California project disturbing an acre or more of soil needs Construction General Permit coverage before the first shovel hits the dirt. Our certified Qualified SWPPP Developers (QSDs) run your risk-level modeling, write a site-specific Stormwater Pollution Prevention Plan, and file your Permit Registration Documents in SMARTS to secure the WDID number your project needs to legally break ground.

We handle the logins, the data entry, and the deadlines — these are the systems we work in every week.
Stormwater permits made painless — NOIs, NECs, sampling results, and annual reports filed for you.
Water-quality permits, discharge requirements, and enforcement records tracked in the state system.
Hazardous materials business plans and waste filings submitted correctly, on time, every time.
Mandatory greenhouse-gas emissions reports compiled and submitted directly to CARB.
Water rights accounting and annual diversion reporting, kept current without the headache.
Compliance submittals, facility status, and permits managed with the State of Oregon.
Water-quality permits, DMRs, and NOI submittals through SecureAccess Washington.
Water pollution control and stormwater discharge permits filed online, including NetDMR.
Centralized e-permitting for water quality, stormwater discharge, and facility compliance.
The federal gateway for NPDES reporting and electronic Discharge Monitoring Reports.
We walk your site, not just your paperwork. Your plans are built from what's actually in your fields, yards, and lagoons.
We speak with the Water Boards, Ecology, ODA, NDEP, and ADEQ on your behalf — you get back to running your operation.
Every number is documented and defensible, so a surprise inspection is just another Tuesday.