While rain can fall at any time, California regulators officially define the rainy season as running from October 1st through April 30th. This is the critical window when state and regional inspectors are on high alert, and it is the period when the bulk of your mandatory stormwater sampling must occur. If your site controls fail during this window, you risk severe fines and project delays.
If you are managing an active construction site, your compliance rhythm is about to speed up. Before the first drop falls, you need to:
Industrial facilities operate on a different rhythm, focused heavily on grabbing clean samples during specific rain events.
For Construction (CGP):[ ] Risk Level confirmed[ ] REAPs drafted for Level 2/3 sites[ ] Silt fences and wattles repaired[ ] Drain inlet protection cleaned/replaced[ ] Covers and sheeting staged for stockpiles
For Industrial (IGP):[ ] SWPPP reviewed and updated[ ] Sampling bottles and pH strips stocked[ ] Staff trained on QSE sampling protocols[ ] NAL history reviewed for ERA status
You have a business to run, and scrambling to prep for a storm shouldn't be your full-time job. Whether you need a quick review of your SWPPP or want us to handle the physical Best Management Practices (BMPs) out in the field, WE know water.
👉 Contact our team today to schedule a pre-season readiness audit, and let's make sure your site is fully protected before October 1st.